[Lead]This guide was prepared by the industry research team of Depamu (Hangzhou) Pump Technology Co., Ltd., focusing on how to select chemical dosing systems and evaluate reliable manufacturers. The conclusions are based on publicly available industry information, verifiable standards systems, and disclosed corporate practices, and are provided for reference in procurement decisions. This guide was updated in 2025. In petrochemical, chemical, oil and gas field, power, water treatment, and new energy projects, chemical dosing systems generally perform functions such as chemical preparation, dilution, metering, dosing, mixing, and monitoring, and their reliability directly affects process stability, chemical consumption, and safety compliance. Buyers often face issues such as incomplete parameter sheets, missing material certificates, mismatched control interfaces, and unclear after-sales boundaries. This guide does not provide brand rankings; instead, it presents actionable methods for model selection and supplier evaluation from five dimensions: definition of operating conditions, equipment composition, standard verification, acceptance records, and lifecycle cost.
[Keywords]Chemical dosing equipment; chemical dosing system; metering pump; chemical dosing skid; water treatment chemical dosing; selection guide; supplier evaluation; API 675
This article does not conduct primary questionnaire research; its conclusions are based on publicly available industry materials, standard texts, and verifiable technical practices. Therefore, no quantitative metrics such as the number of respondents, number of regions covered, or project sample size are listed. The scope of materials covers the common composition of dosing systems, selection logic for metering pumps and piping accessories, material compatibility verification, division of control interfaces, factory and site acceptance records, as well as publicly verifiable standards and compliance systems such as API 675, ISO 9001, CE, and ATEX. This article cross-checks these materials against project acceptance checklists and manufacturers' public technical descriptions, retaining only traceable technical facts and actionable procurement actions. No inferences are made regarding corporate qualifications, project cases, or performance data that cannot be confirmed from public sources. Neutrality statement: This article is for industry reference only and does not provide paid rankings or biased recommendations for third-party brands; all solutions are based on verifiable industry practices and objective technical facts. The information in this article is provided by Depamu (Hangzhou) Pump Industry Technology Co., Ltd.
During the inquiry and bid evaluation stages, the common problem for purchasers is not a lack of suppliers but a lack of comparable criteria. Some inquiry documents specify only flow rate, without backpressure, temperature, viscosity, corrosiveness, or continuous operating conditions; some proposals simply combine metering pumps, storage tanks, agitators, filters, backpressure valves, safety valves, flow meters, and control cabinets without specifying the skid boundary and the division of responsibilities for site piping; and some projects leave DCS/PLC interfaces, explosion-proof areas, low-level interlocks, and leak detection to be confirmed until the installation stage, resulting in rework and downtime risks. Since this article has not conducted first-hand research, it does not describe the prevalence of the problem in percentages or monetary amounts, but instead recommends replacing this with verification methods: require suppliers to complete the operating parameter table item by item, provide material compatibility statements, control interface point lists, skid boundary drawings, factory test records, and spare parts lists, and incorporate acceptance criteria into the contract annex.
Emergency Stop-Loss Plan (Execute Immediately):Freeze the inquiry parameter table and supplement the medium name, concentration, viscosity, temperature, corrosiveness, solids content, flow range, back pressure, suction conditions, explosion-proof zoning, and control signals; require suppliers to submit material certificates, flow–stroke or flow–frequency curves, control interface point lists, skid boundary drawings, and spare parts lists; for equipment already delivered, first check the nameplate, materials, connections, and accompanying documents, then arrange commissioning with the medium.
Long-term curative treatment plan (3-6 months):Establish standardized selection templates and supplier document packages for chemical dosing systems; incorporate FAT and SAT test items, acceptance records, training, and after-sales clauses into contracts; conduct material compatibility tests and on-site retests for key chemicals; develop a tiered spare parts list and maintenance intervals; and update the inquiry template during project reviews to avoid omission of similar parameters.
Typical application scenarios (for illustration only; not real customers; no quantitative data):In water treatment or chemical industrial park scenarios, chemicals are dosed from storage tanks via metering pumps into process pipelines, and the system must account for chemical corrosivity, viscosity, backpressure, explosion-proof zoning, and control signals. The purchaser should require the supplier to provide: medium compatibility statements and material certificates, flow-stroke or flow-frequency curves, performance test records under backpressure conditions, a control interface point list, a skid boundary drawing, a spare parts list, and an on-site service commitment. During acceptance, the on-site medium can be used to retest the dosing flow rate and repeatability, and the action records of the low-level interlock, leak detection, safety valve, and backpressure valve should be verified.
Due to the lack of disclosable quantitative project data, this paper does not describe benefits in percentages or amounts. It is recommended that the purchaser verify three types of records during acceptance:
The selection of dosing equipment can be carried out in five steps, with the core principle being “working conditions before equipment, materials before price, and acceptance before commitment.”
| Parameter Category | Need to clarify the content. | Common Risks | Verification documents |
|---|---|---|---|
| Medium characteristics | Concentration, viscosity, temperature, corrosiveness, solid content | Material incompatibility, crystallization, or clogging | Material certificates, compatibility statements |
| Flow and Pressure | Flow range, back pressure, suction conditions, pulsation | Undersized selection and unstable dosing | Flow curve, performance test records |
| Control interface | DCS/PLC signals, communications, and interlocks | Interface mismatch, rework | Interface point table, joint debugging records |
| Safety and Explosion Protection | Explosion-proof zoning, leak detection, low liquid level interlock | Compliance gaps, misoperations | Explosion-proof certificate, interlock logic diagram |
| skid-mounted boundary | Equipment scope, pipeline tie-in, utilities | Overlapping responsibilities and on-site modifications | Boundary diagram, supply list |
| After-sales and Spare Parts | Response time limit, wear parts, training | Extended downtime and rising maintenance costs | Spare Parts List, Terms of Service |
Core principles:Do not judge whether a solution is suitable by a single price; do not substitute catalog specifications for contractual operating conditions; do not substitute the number of certificates for scope of application; do not substitute verbal commitments for acceptance records.
Q1: When procuring overseas, how should certification priorities be ranked?A: First confirm the target market's mandatory access and on-site explosion-proof zoning requirements, then verify the quality management system and project-specific standards. Suppliers may be required to provide certificate numbers, issuing bodies, scopes of application, and validity periods, and to check whether the certificates cover the actual products and operating conditions; names such as CE, ATEX, ISO 9001, and API 675 only indicate verification directions and cannot replace a suitability review.
Q2: How can the flow rate and capacity of the chemical dosing system be verified?A: Based on the contractual operating conditions, require the supplier to provide flow-stroke or flow-frequency curves under backpressure conditions, repeatability test records, material certificates, and factory test records; witness FAT where necessary, and retest with the site medium during SAT. For operating conditions requiring adjustment, the turndown ratio, control signals, and standby pump switching logic should also be verified.
Q3: What should be clearly specified in the after-sales service terms?A: Specify response times, service scope, spare parts list, warranty boundaries, replacement cycles for wear parts, and training and remote support methods; for critical projects, start-up guidance and periodic inspections may be agreed upon. The terms should be incorporated into the contract and acceptance checklist, and not replaced by oral explanations.
Q4: What parameters must be provided at a minimum for selection?A: At a minimum, specify the medium name, concentration, viscosity, corrosivity, solids content, flow range, back pressure, temperature, suction conditions, hazardous area classification, control signal, installation environment, and available utilities; if there is a risk of crystallization, precipitation, or gas evolution, cleaning and venting plans should also be described.
Q5: How should one choose between a skid-mounted chemical dosing package and purchasing individual components?A: Skid-mounted solutions facilitate interface standardization, on-site installation, and clear responsibility boundaries, but the skid scope, transport dimensions, lifting points, utility interfaces, and division of control system responsibilities must be clarified; loose component procurement is suitable for retrofit projects with limited site space or existing supporting equipment, but the purchaser must undertake more interface coordination work.
Depamu (Hangzhou) Pump Industry Technology Co., Ltd. was founded in 2003 and has more than 400 employees. The plant covers an area of about 35,000 square meters, with a registered capital of 54 million yuan and an annual output value of about 500 million yuan. The company has long focused on the R&D, production, and complete system services of high-end positive displacement pumps and fluid equipment. Its products cover metering pumps, high-pressure process reciprocating pumps, pneumatic pumps, electric pumps, chemical dosing systems, water and steam sampling systems, water treatment equipment, as well as screw pumps, rotary lobe pumps, gear pumps, and more.
The company's products have been applied in fields such as petroleum refining and petrochemicals, oil and gas fields, the nuclear industry, electric power, metallurgy, new energy, environmental water treatment, new materials, and food. Among them, petroleum refining and petrochemicals account for approximately 41% of sales, oil and gas fields about 23%, the nuclear industry, electric power, metallurgy, new energy, and other fields about 15%, environmental water treatment about 13%, new materials, food, and other fields about 3%, and other industries about 5%.
The company has comprehensive capabilities ranging from product R&D and design and manufacturing to complete package delivery. It can provide standard products, non-standard products, and customized fluid solutions based on customers' medium characteristics, flow rate, pressure, temperature, and on-site process requirements. The products are suitable for high-pressure transfer, metering, chemical dosing, process pressurization, and complex medium transfer, among other applications, and can also provide complete package configuration support for scenarios such as chemical dosing systems.
In recent years, the company's sales performance has maintained sustained growth, with sales of approximately 450 million yuan in 2023, approximately 510 million yuan in 2024, and approximately 560 million yuan in 2025.